Vesgantti Portable Massage Bed Table - 3-Section Aluminum Foldable Bea – -UK
Item #1112386 |
Model #4723655
4.5
757$ 50
$ 50
Here are some similar items ...
Best Price. Guaranteed
Find a lower price on an exact item? We'll match it. Some exclusions apply.
Learn MorePay Your Way
Credit card, PayPal or Buy Now, Pay Later options available at checkout. Your choice.
Learn MoreBackrest has 10 adjustable stages. 【CONVENIENT & PORTABLE】: Lightweight yet sturdy construction in a streamlined fold-and-carry design makes setup and breakdown a breeze. 【OIL & WATER-PROOF】: The entire table cover is made of water, oil and FIRE-resistant PVC leather, a highly durable, soft, and vegan-friendly material that is not only easy to clean, but has no offensive smell like other materials. Product details Frame: Aluminum, Subtype: 3 sections Table adjustable height: 62cm to 87cm(height from seat to ground) 3 Section Beauty Couch Therapy Table Vesgantti Portable Massage Bed Table - 3-Section Aluminum Foldable Bea – -UK Massage Table Max Weight Capacity: 551 lbs, Color: Black You can store your accessories under the table for convenience and then conveniently tote or store your massage table in the included carry bag. The adjustable headrest features a premium composite support, resistant to bending and warping. The table legs feature secure, non-slip, non-marring feet, which prevent sliding during massage as well as provide floor protection. Top grade cost performance make it also ideal for therapy students & home users Perfect as a Salon or Tattoo chair, Physiotherapy Plinth or a Shiatsu, Swedish Massage and Reiki Bed. Weighing 15kg, the table’s compact design can even accommodate all accessories to be stored inside the table if desired. Perfect as a Salon or Tattoo chair, Physiotherapy Plinth or a Shiatsu, Swedish Massage and Reiki Bed. The adjustable headrest features a premium composite support, resistant to bending and warping. The table legs feature secure, non-slip, non-marring feet, which prevent sliding during massage as well as provide floor protection Package include: 1 x Massage table, 1 x Headrest, 2 x Collapsible Armrest, 1 x Carrying Case Material: High quality aluminum, durable steel support cables, PVC leather, stainless steel hinge Table Dimensions: 185cm Long (without face cradle) × 60cm Wide (without side arm rests). Reliable massage table The entire table cover is made of water, oil and FIRE-resistant PVC leather, a highly durable, soft, and vegan-friendly material that is not only easy to clean, but has no offensive smell like other materials. Portable Massage Bed Table - 3-Section Aluminium Foldable Beauty Couch for Reiki Therapy Treatment Salon Healing - Metal Headrest Support/with Carry Bag £70.99 【PRODUCT DETAILS】: Table adjustable height: 59cm to 80cm(height from seat to ground) ,Table Dimensions: 185cm Long (without face cradle) × 60cm Wide (without side arm rests). Black) Portable 3-Section Massage Bed Table on Precision crafted of premium-grade materials, this professional massage table features a hardwood frame and durable steel support cables, designed to accommodate a maximum weight capacity up 250kg.
Review
757 Reviews
Ratings may include incentivized customer reviews.
FEATURED PRODUCTS
Sponsored













